At Thomas Ewing, metal drywall framing is now being installed on the first floor of the two story classroom section of the building along with the main entrance and single story classroom sections. Concrete masonry block walls along with storm drains and plumbing lines are being installed on the second story and gymnasium sections. Also in the two story classroom section, ventilation ductwork, electric boxes and electric conduit are being installed on the first floor while steel beams, columns, and joists are being installed on the second floor.
Earthwork continues on the General Sherman site by Trucco Construction Company. Earthwork has begun to prepare the building pad. Despite a delay in getting started on the project, the building is still on schedule to be open for the start of the 2020-2021 school year.
Steve Wigton
Superintendent
.jpg?id=550434)
New General Shermna Site-Plan

New Thomas Ewing Site-Plan
