Junior High Construction Update 9/26/18

At Thomas Ewing, storm drains and plumbing lines are being installed in all restrooms and drywall metal frames.  In the two story classroom section of the building, internal concrete masonry blocks, metal drywall frames, and ventilation ductwork are being installed on the first floor while electric boxes and conduit are being installed on the second floor.  Metal drywall frames are being installed in both the single story classroom section and the main entrance section along with concrete masonry block in the main entrance section.  Electric work continues in the gymnasium section, including the mechanical room and underground plumbing installation continues in the cafeteria/kitchen section.  

 

At General Sherman, the rainy weather continues to limit progress of earthwork on the site.  There will be an informational meeting about the General Sherman construction project for the community on October 2nd at Tarhe Trails Elementary School at 7:00 pm.